MA Inspectors Find Local Inspection Services

Best Well Installation in Boston, MA

Compare 10 local well installation providers in Boston, MA. Verified listings with real contact info.

10 verified providers · Updated 2026-04-28

Quick Compare

1

Avellino Well & Pump Inc

4.3 ★ (27 reviews)

Call
2

Clear Water Pump and Well Service

4.7 ★ (185 reviews)

Call
3

Middleton Well & Pump

5.0 ★ (5 reviews)

Call
1

Avellino Well & Pump Inc

4.3 (27 reviews)
246 Haven St, Reading, MA 01867
2

Clear Water Pump and Well Service

4.7 (185 reviews)
28 Tosca Dr Suite B, Canton, MA 02021
Open 24 Hours
3

Middleton Well & Pump

5.0 (5 reviews)
4 White Ln, Middleton, MA 01949
4

Well Water Connection, Inc.

4.9 (88 reviews)
1980 Turnpike St Building 3, Unit A, NORTH Andover
Open 24 Hours
5

Dean F. Mahon Wells & Water solutions

5.0 (6 reviews)
367 Washington St, Whitman, MA 02382
Mon–Fri 7am–7pm · Sat 7am–4pm · Sun Closed
6

Ogden Wells

4.8 (5 reviews)
358 Boylston St, Lowell, MA 01852
Open 24 Hours
7

AW Pump Hopkinton

4.3 (17 reviews)
5 Cedar St #419, Hopkinton, MA 01748
Mon–Fri 7am–7pm · Sat 7am–3pm · Sun Closed
8

Marks Wells & Pumps Inc

5.0 (43 reviews)
55 Maple St, Bellingham, MA 02019
Mon–Fri 9am–5pm · Sat–Sun Closed
9

New England Well & Pump

5.0 (7 reviews)
6 Millstone Hill Rd, Westford, MA 01827
10

Viera Artesian Well, LLC

5.0 (2 reviews)
15 Wood St, Groveland, MA 01834
Mon–Sun 7am–9pm

Frequently Asked Questions

How much does a complete well installation cost in Massachusetts?

A complete well installation typically costs $12,000 to $25,000, including drilling, casing, pump system, pressure tank, electrical, and plumbing connections. Bedrock wells are at the higher end. State permitting requirements, mandatory water quality testing, and well completion reporting add to the total cost.

What's included in a complete well installation in Massachusetts?

A complete installation includes state-required permits, drilling, well casing and cap, grout sealing, submersible pump and motor, pitless adapter, drop pipe, electrical wiring, pressure tank, pressure switch, water line to the home, and mandatory initial water quality testing per state code.

How long does it take to install a complete well system in Massachusetts?

The entire process typically takes 4-8 weeks from permit application to final approval. Drilling takes 1-3 days, pump and tank installation 1-2 days, and plumbing and electrical connections 1-2 days. Water testing results take 5-10 business days. Permit and inspection timelines vary by jurisdiction. All installations must comply with 310 CMR 22.00 and require a Well Permit from your local board of health before work begins.

More Well Installation Nearby

Related Services in Boston

All services in Boston, MA →